Our Work
With our state of the art equipment and exclusive transport contract, Sand Ground Engineering currently excavates 200,000 cubic metres of sand per year. With contracts ranging from 300 cubic meters to 70,000 cubic metres Sand Ground Engineering caters for all size projects with the same high standards.
With a clientele base comprising of:

GREENGATE

ABI GROUP CONTRACTORS PTY LTD

PARKVIEW CONSTRUCTION PTY LTD
Sand Ground Engineering encompasses not only tier 1 companies but also the smaller tier 2 companies. Please click below on some examples of projects we have completed.
Acscot St – Kensington
Project: Acscot St – Kensington Scope of Work: Secant pile wall, Dewatering, Bulk an detail excavation in sand, Temporary ground anchors
Wyndam St – Alexandria
Company: TQM Design & Construct PTY LTD Project: 43 Wyndam St – Alexandria Project Size: 5,000 cubic metres Scope of Work: Design & Construct Piling (CFA), Bulk Excavation in sand
Botany Rd – Alexandria
Company: 222W PTY LTD Project: 222 Botany Rd – Alexandria Project Size: 12,000 cubic metres Scope of Work: Design & Construct Piling (CFA), Bulk Excavation in sand
Yarranabbe Rd – Darling Point Company
Company: Parkview Constructions PTY LTD Project: 99 -101 Yarranabbe Rd – Darling Point Project Size: 6,000 cubic metres Scope of Work: Design & Construct Piling (CFA), Bulk & Detail Excavation in sand & rock
Doncaster Ave – Kensington
Company: ABI Group Contractors PTY LTD Project: Capella/Phoenix Apartments Kensington Project Size: 40,000 cubic metres Scope of Work: Bulk & Detail Excavation